• Pool Type
  • Project Type Parks & Recreation
  • Project Service Impact Study
  • StatusCompleted 2003
  • ArchitectPeckham & Wright Architects

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Boonville, City of – Feasibility Study

Booneville, MO

In 2003, The City of Boonville retained Peckham Wright Architects & Associates in association with Counsilman-Hunsaker to conduct a study to research aquatic recreation options and to provide information that will help the City of Boonville determine the feasibility of constructing an aquatic center. The purpose of the Feasibility Study was to offer a preparatory, comprehensive study analysis focusing on a potential aquatics facility.

The community considered several options and hired Counsilman-Hunsaker to develop design documents for an outdoor leisure pool. Due to budget restraints, the project was put on hold until 2009. At that time the design team was once again reunited and was retained by the city to develop a new outdoor aquatic center.

Design

The Grand Opening of the new aquatic center was held in May 2011. The new facility includes an outdoor multi-purpose pool and outdoor water sprayground.