• Pool Type
  • Project Type Universities
  • Project Service Facility Audit
  • StatusCompleted 2007
  • ArchitectCannon Design

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Brown University – Facility Audit

Providence, RI

In March 2007, the team of Cannon Design and Counsilman-Hunsaker performed a Facility Audit for the indoor 50-meter pool located in the Smith Swim Center. The assessment evaluated the current lifecycle of the facility and provided options for extending the use of the facility for repair or replacement options.

Regardless of the decision by Brown University to demolish the existing Smith Swim Center or renovate the building and pool, a temporary swimming facility would be required to allow the Swim, Dive and Water Polo teams to practice.

Counsilman-Hunsaker and Cannon Design assisted the University in procuring a temporary building and pool to use for swimming events.

After reviewing the audit results, Brown University made the decision to demolish the Smith Swim Center and replace it with a new state-of-the-art aquatic center. Counsilman-Hunsaker, Robert A. M. Stern Architects and Shawmut Design & Construction were selected as the design-build team for the new natatorium. The new Katherine Moran Coleman Aquatics Center includes an indoor 13,750 sq. ft. stretch 50-meter by 25-yard competition swimming pool to be used for university swim team training, diving, water polo, team practices, and Ivy League meets.