• Pool Type Outdoor 25-Yard x 25-Meter, Outdoor Leisure
  • Project Type Parks & Recreation
  • Project Service Design Services, Impact Study
  • StatusCompleted 2013
  • ArchitectRatio Architect

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Crystal Lake Park Family Aquatic Center

Urbana, IL

Crystal Lake Aquatic Center Crystal Lake Aquatic CenterThe Urbana Park District Board of Commissioners committed to replacing Crystal Lake Park Pool through the passage of a property tax referendum. With broad community support, the first step was to create a concept plan to estimate construction and operating costs of the pool and bathhouse footprint with its desired amenities. Staff and citizens worked together in studying other pools in operation to see how their amenities would best suit the citizens of the Urbana Park District.

Counsilman-Hunsaker, in partnership with Ratio Architects, assisted the park district in the collection and evaluation of data and gathering community input. The team developed multiple concepts and analyzed financial impacts to act as a guide for the replacement of Crystal Lake Pool.

Pleased with the results from the study, Crystal Lake Park Family Aquatic Center opened to rave reviews in July 2013. Integrated into Urbana’s oldest park, the new $7.2 million outdoor aquatic center was designed to serve a wide segment of Urbana’s population. The resulting 15,000 sq. ft. facility creates a fun and attractive environment including:

5,200 sq. ft. Competition Pool

  • Eight 25-meter lap lanes with ADA ramp entry
  • Water basketball
  • Depths ranging from 3 ft. 6 in. to 6 ft. 6 in.

7,700 sq. ft. Leisure Pool

  • Zero beach entry
  • Interactive play structure
  • Underwater shelf for sunbathing
  • Vortex
  • Open and closed flume waterslides

1,700 sq. ft. Plunge Pool

  • Drop slide
  • One-meter diving board
  • 17-foot-high climbing wall
  • Depths ranging from 12 ft. to 12 ft. 6 in.