• Pool Type Indoor 25-Yard x 25-Meter
  • Project Type K-12, Renovation
  • Project Service Design Services
  • StatusCompleted 2009
  • ArchitectBETA Design Group

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Fenton High School

Fenton, MI

Renovation for the 1969 functionally obsolete swimming pool included significant modifications to the structure as well as a completely new recirculation system. The existing six lane pool was deepened and enlarged to a new eight lane 25-yard competition pool with stair entry and gallery seating.

Major renovations include:

  • Increased pool depth by raising the water level and creating a faster and more user-friendly perimeter overflow system
  • Enlarged the pool from six to eight lanes
  • Increased the pool depth below diving board bringing it up to current code standards
  • Addition of stair alcove to meet ADA requirements
  • Addition of completely new chemical and filtration systems, including regenerative media filtration and ultra-violet treatment
  • Unique structural challenges included tying in existing concrete walls and slabs to new structures
  • Utilized below deck mechanical space to accommodate larger recirculation and filtration systems
  • The high school also underwent renovations to expand the fine arts wing and lunch room, and added an auxiliary gym.