• Pool Type Indoor 25-Yard
  • Project Type Universities, Renovation
  • Project Service Design Services, Facility Audit
  • StatusCompleted 2012
  • ArchitectHord Coplan Macht

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Harford Community College

Bel Air, MD

Cochran Stephenson & Donkervoet Architects originally commissioned Counsilman-Hunsaker to perform a swimming pool audit on behalf of the Harford Community College. Built in 1968 and located in the Susquehanna Center, the 25-yard indoor pool was in need of major updating and repairs. The audit of the aquatic center included the evaluation of the current condition of the pool including pool finishes, deck areas, gutter and filtration systems, pool water heating equipment, chemical feed and control systems, and piping and recirculation systems.  The audit also identified design or equipment deficiencies. The final report detailed the existing condition of the pool and its equipment including life expectancies.  Recommendations were prioritized for short-term and long-term repairs or replacements which included cost estimates.

Aquatic Design and Engineering

In 2012, Counsilman-Hunsaker was retained by Hord Coplan Macht to provide aquatic design and engineering services for renovations to the swimming pool components including all new pool piping, new mechanical systems, and new finishes to the gutter and pool.  Total renovation cost was $27,000,000.

.