• Pool Type
  • Project Type Parks & Recreation
  • Project Service Impact Study
  • StatusCompleted 2012
  • ArchitectFennel Design

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

Rapid City, City of

Rapid City, SD

The City of Rapid City, South Dakota, retained the team of Fennel Design and Counsilman-Hunsaker to assess their existing aquatic facility at Horace Mann Park and to provide options for renovation or replacement of the existing 50-meter pool which had reached physical and functional obsolescence. The study also provided options for the development of an outdoor pool at Roosevelt Park. The team developed concepts and provided a revenue and expense analysis, construction costs, project costs, attendance, and operating revenue to give a complete picture of what each facility would cost to build and operate.

Aquatic Design & Engineering

Based on the results of the study, the city once again retained the team of Fennel Design and Counsilman-Hunsaker to replace the 50-meter pool at Horace Mann Park with a new outdoor aquatic center featuring a lap pool, recreation pool, and waterslide tower. In addition to the Horace Mann Park pool replacement, a new ten lane 50-meter outdoor pool was constructed next to the Rapid City Swim Center to be utilized to host major swim meets and community recreational swimming.