Mt. Vernon, City of

Mt. Vernon, IL

The existing 40-year-old Mt. Vernon City Swimming Pool had reached physical and functional obsolescence. The consultant team of Counsilman-Hunsaker and FGM Architects developed an aquatic feasibility study, which offered three concepts for the city’s budget.

The concepts evaluated the pros and cons of three options: an outdoor pool option, an indoor pool option, as well as an indoor therapy pool with an outdoor recreation pool. By having a comparison of options, the city was able to focus on self-sustaining pools with appropriate features that would meet the needs of the community in the most fiscally sustainable manner.

Aquatic Design & Engineering

Pleased with the results from the study, in March 2012, the city decided to move forward with the design of a new outdoor aquatic facility that will feature an outdoor 17,000 sq. ft. aquatic center featuring a six lane 25-meter pool, lazy river, and sprayground.