• Pool Type
  • Project Type Universities
  • Project Service Facility Audit
  • StatusCompleted 2016
  • ArchitectC Design, Inc.

ADVANCED SEARCH

Select options below to search the portfolio database

Pool Type

Project Sector

Project Service

Project Location

University of North Carolina

Charlotte, NC

UNC – Charlotte retained Counsilman-Hunsaker to audit their swimming pool in Belk Gym for NCAA Competitions. The audit reviewed the current pool condition, and provided the necessary information needed to comply with NCAA regulations for 25-yard competitive swimming. Detailed items were assessed and addressed to bring the pool within compliance to NCAA Guidelines.

In April 2016, renovation was completed:

  • Replacement of the main drain system with new Virginia Graeme Baker compliant main drains.
  • Replacement of failing cast iron recirculation piping with new PVC piping feeding the pool wall inlet system
  • Removal of existing pool tile and replacement with new tile lane lines, wall targets and gutter along with a new plaster finish.
  • Additional items include the replacement of underwater lights, new pool ladders and a new pool deck coating.